Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

Construction Index
theconstructionindex.co.uk > news > view > rodgers-to-lead-expandeds-geotechnical-business

Rodgers to lead Expanded's geotechnical business

1+ day, 15+ hour ago   (316+ words) Rodgers will be the first female business unit leader of any of Laing O'Rourke's specialist trading businesses. She will take on the role in Expanded Geotechnical as former lead Ronan O'Rourke moved to become director of clients and markets for…...

Construction Index
theconstructionindex.co.uk > news > view > geotechnical-engineering-picks-isuzu

Geotechnical Engineering picks Isuzu

3+ mon, 5+ day ago   (343+ words) The purchase upgrades 7t light commercial trucks from another manufacturer, as the ground investigations contractor sought to increase payload capacity. The new trucks are mounted with bespoke beavertail bodies from Truck Hydraulics, each featuring a three-metre ramp to ensure a load…...

theconstructionindex.co.uk
theconstructionindex.co.uk > news > view > bauer-secures-dovetail-building-piling

Bauer secures Dovetail Building piling

7+ mon, 2+ week ago   (246+ words) Bauer Technologies has been commissioned by Deconstruct UK on behalf of client Brockton Everlast to set the foundations for a three-level basement and 24-storey tower at 1 Cutler Street in London EC3. The Dovetail Building, designed by architect Allford Hall Monaghan Morris…...

theconstructionindex.co.uk
theconstructionindex.co.uk > news > view > drilling-unlocks-data-for-palace-of-westminster-restoration

Drilling unlocks data for Palace of Westminster restoration

8+ mon, 4+ week ago   (537+ words) Between April and September 2025, two boreholes were drilled on Parliament’s River Terrace and a further 14 boreholes were drilled to depths of up to 74.5 metres in the River Thames to map geological conditions. Using a jack-up barge, positioned opposite the Palace’s…...